top of page
SR A1A EMERGENCY RESTORATION
FROM NE 14TH COURT TO NE 18TH STREET
CEI - Construction Engineering Inspection
SCOPE OF WORK
As a member of the Consor Team, Castillo Engineering provided construction engineering inspection services for the SR. A1A Emergency Restoration between NE 14th Court and NE 18th Street Project. This project consisted of the restoration of SR. A1A between NE 14th Court and NE 18th Street after super storm Sandy caused coastal flooding in the southeast Florida region. The restoration included installing permanent sheet piles along the entire project corridor to preserve the road, constructing temporary pavement, desilting the existing drainage system, and installing signing and pavement markings. In addition, there was a beach sand restoration project by Broward County taking place concurrently. Coordination with the County Contractor and FDOT Contractor was an important element in the success of this project.
CLIENT
Florida Department of Transportation (District 4)
LOCATION
Broward, Florida
PROJECT COST
$8 Million
1/1
bottom of page