top of page
fdot_logo_white.png

SR A1A EMERGENCY RESTORATION

FROM NE 14TH COURT TO NE 18TH STREET

CEI - Construction Engineering Inspection

SCOPE OF WORK

As a member of the Consor Team, Castillo Engineering provided construction engineering inspection services for the SR. A1A Emergency Restoration between NE 14th Court and NE 18th Street Project. This project consisted of the restoration of SR. A1A between NE 14th Court and NE 18th Street after super storm Sandy caused coastal flooding in the southeast Florida region. The restoration included installing permanent sheet piles along the entire project corridor to preserve the road, constructing temporary pavement, desilting the existing drainage system, and installing signing and pavement markings. In addition, there was a beach sand restoration project by Broward County taking place concurrently. Coordination with the County Contractor and FDOT Contractor was an important element in the success of this project. 

CLIENT

Florida Department of Transportation (District 4)

LOCATION

Broward, Florida

PROJECT COST

$8 Million

bottom of page