I-75 EXPRESS LANES - SEGMENT C

FROM SOUTH OF MIRAMAR PARKWAY TO SOUTH OF SHERIDAN STREET

CEI - Construction Engineering Inspection

SCOPE OF WORK

As a member of the A&P Team, Castillo Engineering provided construction engineering inspection services for the I-75 Express Lanes Segment C from South of Miramar Parkway to South of Sheridan Street project. The I-75 Express Lanes Segment “C” improvements include design and construction within the existing 166- foot wide median and consisted of a barrier wall divided 4-lane tolled roadway. Each direction now has two, 12- foot travel lanes with 6-foot paved inside shoulders and 12-foot (10 feet paved) outside shoulders. The project also includes the construction of the Pembroke Road Overpass Bridge replacing the I-75 bridges at the C-4 with a culvert, as well as the reconstruction of the Miramar Parkway Interchange, including the Miramar Parkway Bridge over I-75.

CLIENT

Florida Department of Transportation (District 4)

LOCATION

Broward, Florida

PROJECT COST

$85.2 Million

bottom of page