2017 FICE Outstanding Project Awards Pro

SR 838 / SUNRISE BOULEVARD BRIDGE NO. 860669

SUNRISE BLVD BRIDGE REPLACEMENT OVER MIDDLE RIVER

CEI - Construction Engineering Inspection

SCOPE OF WORK

As a member of the Consor Team, Castillo Engineering provided construction engineering inspection services for the SR. 838/Sunrise Blvd. Bridge No. 860669 over Middle River Project. This project consisted of replacing the existing bridge that crosses over Middle River. The work included the construction of a temporary prefabricated bridge (with temporary signalization), permanent signalization upgrades at major intersections, drainage work, milling and resurfacing, lighting, signing and pavement markings, construction of new sidewalk, and landscaping with a gateway architectural wall. 

CLIENT

Florida Department of Transportation (District 4)

LOCATION

Broward, Florida

PROJECT COST

$9.5 Million