2017 FICE Outstanding Project Awards Pro

SR 838 / SUNRISE BOULEVARD BRIDGE NO. 860669

SUNRISE BLVD BRIDGE REPLACEMENT OVER MIDDLE RIVER

CEI - Construction Engineering Inspection

SCOPE OF WORK

As a member of the Consor Team, Castillo Engineering provided construction engineering inspection services for the SR. 838/Sunrise Blvd. Bridge No. 860669 over Middle River Project. This project consisted of replacing the existing bridge that crosses over Middle River. The work included the construction of a temporary prefabricated bridge (with temporary signalization), permanent signalization upgrades at major intersections, drainage work, milling and resurfacing, lighting, signing and pavement markings, construction of new sidewalk, and landscaping with a gateway architectural wall. 

CLIENT

Florida Department of Transportation (District 4)

LOCATION

Broward, Florida

PROJECT COST

$9.5 Million

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
1/1